Quality control for electronics bought in China runs in four moments: sample approval, checks during production, pre-shipment inspection and loading control. The pre-shipment inspection uses AQL sampling with a written checklist per category, and its report is the basis for paying the balance or asking for corrections.
The four stages of control
| Stage | When | What it is for |
|---|---|---|
| Sample approval | Before production | Sets the reference everything is measured against |
| During production | With part of the lot made | Catches problems while they can still be fixed |
| Pre-shipment | Goods finished and mostly packed | Decides whether the lot is accepted and the balance paid |
| Loading control | When the container is loaded | Checks quantities, packing and the seal |
Not every order needs all four. A known model from a factory with a good record can go straight to pre-shipment inspection. A new product is worth checking during production too.
How AQL sampling works
Sampling follows the tables of ISO 2859-1. The lot size sets how many units are opened and how many defects are accepted at most, separately for critical, major and minor defects.
| Defect type | Example | Usual criterion |
|---|---|---|
| Critical | Electrical risk, exposed wire, wrong plug | Zero accepted |
| Major | Does not power on, remote missing, does not connect | Strict agreed level |
| Minor | Light scratch on a hidden area, crooked label | More lenient agreed level |
The level is agreed with the importer before the visit. A passed AQL means the lot is within the accepted risk, not that it has no defect at all.
Checklists by category
| Category | Minimum tests |
|---|---|
| Televisions and monitors | Power-on, screen pattern, pixels, operating system, menu language, ports, remote |
| Audio | Pairing, maximum volume without distortion, battery, charging, accessories |
| Refrigeration | Cooling test, door seals, noise, shelves, voltage and plug |
| Laundry | Full or partial cycle, drain, lid, hoses, voltage |
| Small appliances | Every function, temperature, timer, part fit, manual in your language |
| Packing | Carton markings, corner guards, agreed drop test, units per master carton |
How to read an inspection report
- Check that order, model and quantity match your purchase order.
- Review the AQL level applied and how many units were opened.
- Look at defects by type: critical, major and minor, with photos.
- Read the result: accepted, rejected or on hold pending correction.
- If rejected, ask for the correction plan and a new inspection.
What to do if the lot fails
- Ask the factory to sort and fix the defective units.
- Reinspect after the correction, with the same criteria.
- Hold the balance until you have an accepted report.
- If the defect is in the design, go back to the approved sample and decide before producing more.
Mistakes that repeat
- Using one generic checklist for the whole container.
- Inspecting too early, with the goods unfinished.
- Not testing at the destination market's voltage.
- Not keeping a sealed approved sample as the reference.
Frequently asked questions
Which standard is used for sampling?
The AQL tables of ISO 2859-1, at the level agreed before the visit.
When is a during-production check worth it?
With new products, factories without a record or large orders.
Who pays for a reinspection?
It is agreed beforehand; usually the factory covers it if the rejection came from its production.
Can I ask for extra tests?
Yes. They are added to the checklist before the visit.